| Year | 2024 |
| Country | Uruguay |
| Variable (Code) | Time (days) to obtain a residential construction permit (PV-2-03) |
| Methodological note | Number of days, on average, to obtain a residential construction permit. The reference here is the most populated city. |
| Source | Equipo consultor |
| Note | |
| Date | 2024 |